Remote Civil Infrastructure Projects
Central West Project
For this project we where task with excavating, steel fixing, concreting and back filling ready for the tower to be built and landed. Across this project we had 8 site we completed
.jpeg)


Tower Footing Upgrade
This project wasn't without its challenges, with tight access not a lot of room to store martials and the weather to contend with it was a relief to get it over the line.



Tower Hut Decom
We where task with job a dismantling a tower hut with very steep access, very rutted and rough access track, with no way of transporting the demo materials back down the hill we brought in a on site crusher, crushing all concrete and bricks in to gravel then using that gravels to repair the track for better access
.jpeg)


Guyed Mast Tower
Challenging was an understatement for this project the remoteness, the uneven terrain, the rocks. We excavated over 200ton of rock mixes with soil, steel fixed over 15t of reo, pored 100 cub of concrete and roughly 200m of fencing so we could install a 85m guyed mast for emergency calls.